Ulster Bank HQ Fire Alarm Systems

UlsterBankBelfast

The Project..

The development was created around the façade of an old Methodist church designed by Dublin architect, Isaac Farrell and consists of a reinforced concrete frame with flat slab floor construction including a double storey basement. It required a life cycle replacement of its existing fire alarm system, which had been in service for 18 years, along with additional detection as necessary to validate L1 coverage.

Overview

Owned by RBS, Ulster Bank is a leading bank in Ireland with a branch network across both Northern Ireland and the Republic of Ireland. Its 125,000sq ft seven storey headquarter building is built on top of a two-storey basement providing 120 parking spaces.

soteria.jpg

Meeting the clients Requirements

Aramark Ireland were appointed by Ulster Bank to perform the role of main contractor for the works. Following a tender process, fire alarm specialist Ashdale Engineering Ltd was appointed to replace the existing closed protocol fire alarm system and PAVA system

Aramark project manager Michael Hyland said: “We were pleased to be able to appoint Ashdale for the key role of fire alarm replacement. Having delivered a similar project with them in 2015 for the same client we had total confidence in their ability. Ashdale performed flawlessly and the project was delivered on time and within budget.

The works had to be conducted out of normal hours to avoid disruption to the bank. This meant the team working overnight over a 12-week period and making sure the system was fully functional and all work areas clean and tidy for staff coming in the next day.
In the role as principal contractor Aramark were also responsible for all the health and safety management relating to the project. Some of the work involved detection replacement in the 25-metre-high atrium, working at height over areas of plant, lift shafts and HV switch rooms. H&S manager for Aramark Gary Henderson said: “The project certainly had its challenges but with planning, consultation and coordination with Ashdale and other contractors we were able to deliver the project safely and without incident.”